Originally Posted by
Brockas
These are the indicative dates for the 2017 Supercruises:
7th Jan
13th May
5th August
28th Oct
In other exciting news, I've just spoken to MSW who have confirmed that a track extension is occurring at the motorplex, taking advantage of the hillclimb section that already exists. They have secured and received funding already for this extension and construction should start sometime in January.
The extension will run through onto existing track which is currently used for the hillclimb just after turn 2 and tie back into the track just after turn 5.
From what I can tell this is how it will look, but naturally this is just an estimate at the moment based on the existing infrastructure down there:
Exciting!
Will need quite a bit of work to be safe and fast,
The section where the extension starts it starts is very narrow and bumpy and both concrete and bitumen,
Left hander is downhill and off camber also very narrow and bumpy until you turn left to go back up the hill,
The straight is good quality, fairly new and wide bitumen,
The 90 degree left is tighter than it looks and is off camber and down hil and then that back straight will be stupid fast
Nismo Sauras Jr 290hp and 450kg
61.3 Long track Wanneroo,
52.4 Short track Wanneroo
46.55 Collie
Patiently waiting for the home reno’s to be finished before more aero mods to break those times above
Bookmarks